The HelioRack 3V with east-west orientation was used to implement this project.
By choosing our flexible mounting system, the system could be optimally integrated into the sloping terrain. The project thus underscores how even challenging locations can be successfully developed with a customized system selection.
Output: 4.5 MWp
System: HelioRack 3V East-West
Modules: 7128 units
Tables: 3V18, 3V14, 3V10, 3V9, and 3V6
Special features: Sloping terrain
Construction period: July–August 2025